Kimley-Horn |
Memorandum ![]()
To: Joe Kott
CC: College Terrace Traffic Calming Committee
From: Jim West
Re: Summary of Advisory Committee Meeting #1
(August 19, 2003)
Date: 27
August 2003
attendees
• Joe Kott City of Palo Alto
•
Jim West Kimley-Hom and Associates, Inc.
•
Michael Mowery Kimley-Horn and Associates, Inc.
•
John Ciccarelli Committee member (professional experience with
bike plans)
•
Grace Liu Co-chair of Traffic Committee
•
Louise Roche Committee member
•
Kathy Durham Co-chair of Traffic Committee
•
Paul Lomio Committee member, webmaster for committee website
•
Emily Marshall Committee member
committee composition
The
following individuals or groups were identified as possible additions to the
Committee roster:
•
Charles Carter
from Stanford
•
Paul Garrett
•
John Mark
Agosta
•
Persons
renting in the project area
Seek a mix of residents to serve on the
committee that live on closed and open streets.
roles and responsibilities
•
Joe Kott will
coordinate with Stanford, City, utilities, Public Works, etc.
•
Jim West and Mike
Mowery will function as technical advisors.
•
Advisory
Committee will help educate, inform, and communicate with neighborhood
items of note
•
School commute
corridors receive preference for improvements (2 elementary schools on
Stanford - Stanford and
Hanover are school commute corridors)
•
Hanover is a
regional bike route
•
Project on El
Camino will improve El Camino and major intersections
•
Mayfield deal
will add homes and likely traffic in the south-west part of the project area
(Mayfield agreement in front of Council in March)
K:\0970I2005 - Palo Alto - College Terrace - JEW\Docs\CollegeTerracc PACMtgl.doc
process
•
Buy-in critical from neighborhood
•
Recommend a couple plans from committee to entire neighborhood
•
Turn restrictions, humps, etc. would require council approval
•
We need to use what we learned from Downtown North and Evergreen
traffic calming
projects
•
Trial could accept 50% + 1 of responders,
but threshold for approval still to be
determined
•
Final should accept 50% + 1 of all residents and property owners
but threshold for
approval still to be determined
•
Permanent measures must be approved by
council
•
Important that everyone understand that they
may not like everything about the Plan
project outcomes & objectives
Performance Measures
1.
Deter cut through traffic
2.
Reduce excessive traffic speeds
3.
Improve civil driving
4.
Improve effectiveness of existing closures
5.
Improve aesthetics of existing traffic
calming measures
6.
Improve traffic safety by reducing accidents
7.
Improve the safety and experience for pedestrians and bicycles
Constraints
1. Minimize traffic shift onto other residential streets
Outcome
1.
Approved plan for trial installation
2.
Successful trial
3.
Approved plan for implementation
4.
Successful implementation of plan
action items
•
City to provide fire response map for neighborhood station (FD
likes speed tables, not
speed humps)
•
City to provide trash service map and details
for neighborhood
•
City to provide "Channing" presentation
•
City to provide crash data from Police
Department
•
City to prepare a purpose and need statement
•
City to whether there are any Public Works projects planned for
the neighborhood that
should be coordinated with the traffic
calming project
•
Kimley-Horn to prepare meeting notes
•
Next meeting scheduled for 2 October 2003, at 7:45 AM. Meet at
Kathy Durham's home.
K:\097012005 - Palo Alto - College Terrace - JEW\Docs\CollcgeTerrace PACMtgl doc
COLLEGE TERRACE TRAFFIC CALMING PLAN
Project Schedule
|
|
|
|
|
|
Advisory Committee Meeting #1 |
|
XXX |
Please see PDF version of this Project Schedule for time line |
|
|
|
|
|
|
Evaluation of Data |
|
X |
|
|
Advisory Committee Meeting #2 |
-Field review at 7:45am -Meet at Kathy Durham's house @ 9:00am |
XXX |
|
|
|
|
|
|
|
|
|
|
|
|
Draft Existing Conditions Report |
|
X X |
|
|
|
|
|
|
|
Neighborhood Mtg #1 |
-Introduction to project, traffic calming concepts, report on Final Existing Conditions report |
XXX |
|
|
Final Existing Conditions Report |
|
X X |
|
|
|
|
|
|
|
Preliminary Design of Plan Alternatives |
|
X X |
|
|
|
|
|
|
|
Advisory Committee Meeting #3 |
-Comments rec'd on Preliminary Design |
XXX |
|
|
|
|
|
|
|
Revise Design of Plan Alternatives to Intermediate |
|
X X |
|
|
|
|
|
|
|
Neighborhood Mtg #2 |
-Comments rec'd on Intermediate Design |
XXX |
|
|
|
|
|
|
|
Advisory Committee Meeting #4 |
-Comments rec'd on Intermediate Design |
XXX |
|
|
|
|
|
|
|
Revise Design of Plan Alternatives to Final |
|
X X |
|
|
Neighborhood Mtg #3 (if necessary) |
-Comment on Final Design |
XXX |
|
|
|
|
|
|
|
Survey (Determine if trial installation should go ahead) |
|
X X |
|
|
Final Plan and Estimates |
|
X X |
|
|
Planning Commission Meeting |
|
XXX |
|
|
City Council Meeting |
|
XXX |
|
|
|
|
|
|
|
Trial Installation |
|
X X |
4/IayJ|:- |
Kimley-Horn and Associates, Inc.
10/1/2003